Delray Beach, Florida
Full-gut bathroom remodels from a licensed contractor based in Delray Beach · CBC1269429
Our shop is at 3125 Albatross Rd, Unit B, in Delray Beach. That means short drives, fast site visits and a crew that knows how the city's permit desk works. We take bathrooms down to the studs and rebuild them with a waterproofed shower, new plumbing rough-in, tile, glass and a vanity that fits how you actually use the room.
| Company | North2South Renovations, 3125 Albatross Rd Unit B, Delray Beach, FL 33444 |
|---|---|
| License | Florida Certified Building Contractor CBC1269429 (Colby Matheny) |
| Typical cost | $19,500 to $45,000 for most guest and primary baths |
| Recent local project | Full-gut bathroom remodel for Jessica in Delray Beach, $20,000 |
| Build time | 3 to 5 weeks for a full remodel, after permits |
| Permits | City of Delray Beach building permit; condo or HOA approval where required |
| Phone | (561) 664-3256 |
Jessica's bathroom in Delray Beach was dated and tired. We gutted it to the framing, rebuilt the shower with a full waterproofing system, set new tile and installed a new vanity and fixtures. The total was $20,000. Watch the before-and-after, or read the full case study.
Delray Beach has five locally designated historic districts: West Settlers, Old School Square, Del-Ida Park, Marina and Nassau Park. Interior bathroom work in those neighborhoods usually goes through a normal building permit. Exterior changes, like a new or resized bathroom window, can bring in historic review, so we check your address before we design.
Florida HB 803 took effect July 1, 2026. It lets single-family owners skip a building permit for some work under $7,500, but not plumbing, electrical, structural or gas work, and not in flood hazard areas. A real bathroom remodel moves drains, valves or wiring, so plan on a permit. We file it and close it out.
Many Delray bathrooms are in condo buildings with their own rules: approved work hours, elevator reservations, insurance certificates and sometimes sound-rated underlayment under tile. We assemble that packet for the association so approval doesn't stall the job. See permits and HOA/condo approvals.
In older Delray homes we often find cast iron drains, galvanized supply lines or rotted subfloor under the old tub. We price the likely fixes up front and show you what we find before anything is covered back up.
| Bathroom project | Typical range | Build time |
|---|---|---|
| Powder room update | $6,500 to $14,000 | 1 to 2 weeks |
| Guest bath with tub-to-shower conversion | $19,500 to $39,500 | 2 to 4 weeks |
| Primary bath remodel | $23,000 to $45,000 | 3 to 5 weeks |
| Luxury primary suite | $49,500 to $99,000+ | 6 to 10+ weeks |
Typical ranges from our Palm Beach County projects, including labor, materials, permits and cleanup. Not a quote: your estimate is a written, fixed scope after we measure. Want a quick number? Use the remodeling cost calculator.
Colby Matheny founded North2South Renovations in 2010 and holds Florida Certified Building Contractor license CBC1269429. He estimates every job and stays on it until the walkthrough. Our own crew handles demolition, waterproofing, tile, glass and finish carpentry, and we pull and close every permit. North2South is rated 5.0 on Google from 90 reviews.
Tell us about your project and Colby will visit, measure and give you a fixed-scope estimate, with no obligation. Licensed contractor CBC1269429.
Every shower gets a full waterproofing system and a flood test before tile goes up.
Your estimate lists the work line by line, so the price doesn't drift.
Same team from demo to walkthrough, with Colby checking the work.
Typical ranges are on this page, and our case studies show real totals.
Downtown and Atlantic Avenue, the Marina and Del-Ida Park historic areas, Lake Ida, Seagate and the beach condos, Tropic Isle, and west Delray communities toward Military Trail and beyond. We also remodel bathrooms in nearby Boynton Beach and Boca Raton.



Photos from our Jupiter Farms whole-home renovation.
Yes. North2South Renovations operates from 3125 Albatross Rd, Unit B, Delray Beach, FL 33444.
Jessica's full-gut bathroom remodel in Delray Beach cost $20,000, including demolition, waterproofing, tile, vanity and fixtures. See the case study.
Usually not for interior work. Exterior changes, such as a new bathroom window, can need historic review. We check your property before design.
Most of our bathroom projects run $6,500 to $14,000 for a powder room, $19,500 to $39,500 for a guest bath with a tub-to-shower conversion, $23,000 to $45,000 for a primary bath, and $49,500 to $99,000+ for a luxury primary suite. A recent full-gut bathroom we finished in Delray Beach came in at $20,000.
No. Florida HB 803, effective July 1, 2026, exempts some single-family work valued under $7,500 from a building permit, but it does not cover plumbing, electrical, structural, mechanical or gas work, and it does not apply in flood hazard areas. A real bathroom remodel moves drains, valves or wiring, so it still needs a permit.
Yes. We add blocking for grab bars during framing, build curbless or low-threshold showers, add benches and handheld wands, and widen doorways where the wall allows. See aging-in-place remodeling.
★★★★★ 5.0 on Google from 90 reviews. Here's what homeowners say on camera.